Meehan Street and Dieppe Drive Construction

 

The Meehan Street and Dieppe Drive Reconstruction project has been prioritized to address aging infrastructure.  The scope of the project includes replacement of watermain, replacement of sanitary sewer, storm sewer, curb and gutter, and asphalt driving surface.  A new sidewalk is being added to the west side of Meehan Street to improve sidewalk connectivity.  The proposed design follows the City's Complete Street Guidelines to make the street accessible for roadway users of all ages and abilities.

Existing Conditions

Existing Conditions

This will be implemented by removal of the on-street parking on the east side of the road and slight narrowing of the road to facilitate the space of the new sidewalks.

Proposed Meehan Street Cross Section with Sidewalk on Both Sides
                             Proposed Meehan Street Cross Section with Sidewalk on Both Sides


Proposed Dieppe Drive Cross Section
                                                     Proposed Dieppe Drive Cross Section

Schedule
Phase 1 - Meehan Street
  • Tentative Start Date - Week of April 15, 2024
  • Anticipated Completion - July 2024
Phase 2 - Dieppe Drive
  • July - September 2024
Project Contacts
City Project Manager                       City Inspector
Javier Hernandez, C.E.T.   Josh Hare, C.Tech
T 519-631-1680 x4259   T 519-631-1680 x4221
 [email protected]    [email protected]