Wastewater Management Master Plan

 

The City of St. Thomas has prepared a Master Plan for its wastewater treatment infrastructure as part of ongoing efforts to improve the performance of the City's infrastructure.  St. Thomas Water Pollution Control Plan (WPCP) Waste Management Master Plan (WWMP) will provide the City with guidance for capital planning and project implementation for wastewater treatment to accommodate growth for the next 20 years and beyond in a cost effective and environmentally sustainable manner.

WPCP photo

The Process
The study was undertaken in accordance with the Municipal Class Environmental Assessment (EA) process for Master Plans (Municipal Engineer's Association Class EA document October 2000, as amended in 2007, 2014 & 2015).  The Class EA developed a series of options and  evaluated them based on technical, aesthetic, socio-economic, cultural heritage and environmental factors.
The Findings
The Master Plan is available for public comment from December 21st, 2023 to January 28, 2024.  Please download the file here.

A copy of notice of completion can be found here.
Contacts
Contact details of the study team are listed below:

Pat Anckaert, P.Eng.
Senior Project Manager, Industrial Development
City of St. Thomas
Tel:  226-378-3671
[email protected]
545 Talbot Street, PO Box 520
St. Thomas, ON  N5P 3V7
       John Tyrell, M.Sc. (Eng), P.Eng
Senior Project Manager 
R.V. Anderson Associates Limited
Tel:  519-681-9916 ext. 5038
[email protected] 
557 Southdale Road East, Suite 200
London, ON  N6E 1A2